Portfolio

What we do

We are specialists in all types of soil stabilisation including Lime stabilisation, Cement stabilisation and other combinations of powders. See our prestigious contract portfolio that will give you an insight into the variety of different contracts we can undertake. In addition, we carry out earthworks associated with Stabilisation, enabling us to give you a ‘One-Stop Solution’ on your projects.

Our Projects

Please see below some of  the different projects that our management team have delivered.

Radcot & Shifford Locks Access Roads – Insitu Cement Recycling

Client: National River Authority
Main Contractor: Dyer & Butler Ltd
Location: River Thames Radcot & Shifford, Oxfordshire
Contract Duration: 5 Days
Size: 2,228 m² (Radcot 958.3m² – Shifford 1.269.7m² )
 

The roads leading to the Locks had become a pot holed, crumbling surface in a poor state of repair. A mile off the beaten track, Shifford lock entrance road […]

LANCASTER FLOOD ALLEVIATION SCHEME – EARTH BUND SECTION

Client: Environment Agency
Quantity Stabilised: 75,500m³

 
Project Overview
We commenced the excavation and filling of earth bund section of this Environment Agency Scheme together with Mowlem Civil Engineering (now Carillion). The EA had secured a large borrow pit area. They then tested the soils for suitability for use as construction fill in the bund. They found that […]

LIPPITS HILL – Metropolitan Police Air Support Unit

Client: Metropolitan Police Air Support Unit
Main Contractor: Walker Construction Ltd
Main Sub Contractor: Tom Blackwell Ltd
Quality Stabilised: 6500m³
 

Lippits Hill is home to the Metropolitan Police Air support Unit the ‘Sky Cops, as featured on the BBC programme of the same name. The two Eurocopter EC145 choppers patrol the air over Lodon, providing assistance to the ground patrols.

Furthermore, […]

A66 TEMPLE SOWERBY-BY-PASS

IN-SITU LIME CONDITIONING AND LIME/CEMENT STABILISATION FOR CAPPING

Client: Highways Agency
Main Contractor: Skanska Construction UK Limited
Quantity Embankment Fill: 48,886m³
Capping Layer: 21, 326m²

 
Project Overview
The A66 trunk road runs through the village of Temple Sowerby in Cumbria, which has been desperately waiting 24 years for a bypass. The main contractor, Skanska, appointed Beach Soil Stabilisation as specialist stabilisation […]